Solar Panels in Alton

CRG Direct is an MCS certified solar panel installer based in Port Solent, about 22 miles from Alton in a straight line. Solar panels start from £7,522, or £9,266 for 10 panels and a battery.

MCS CertifiedNICEIC Approved
in pounds

Get a free quote in Alton

Your information is secure and will never be shared.

Solar in Alton: the local details

Alton’s housing changes from one side of town to the other. The 2021 Census shows semi-detached houses as just over half of homes in the Alton Amery ward, detached houses as more than four in ten in Ashdell and Whitedown, and flats and terraces as more than half of homes in Eastbrooke and Westbrooke.

Out of town the picture is different again. In the Four Marks and Medstead ward about two thirds of homes are detached, which usually means more roof to work with and a wider choice of which slope to use. On a terrace or a semi the roof is smaller, so the layout has to be fitted around chimneys, dormers and roof windows.

East Hampshire District Council

East Hampshire District Council is the planning authority for Alton, Holybourne, Four Marks and Medstead. Chawton and Binsted are inside the South Downs National Park, where the National Park Authority is the planning authority and East Hampshire District Council processes applications on its behalf.

Most houses can have roof panels without a planning application, under the national permitted development rules: on a pitched roof the panels must stay below the highest part of the roof, not counting the chimney, and project no more than 200mm from the slope. A listed building is outside those rules, and work that alters one needs listed building consent.

Alton has three conservation areas of its own: the town centre (designated in 1970 and revised in 1982), The Butts (1976) and Anstey (1995). Holybourne has had one since 1977, and Chawton (1977) and Binsted (1982) each have one inside the National Park. In a conservation area panels cannot be fitted to a wall that fronts a highway. In a conservation area or the National Park, panels on a flat roof need prior approval from the planning authority.

Scottish and Southern Electricity Networks (SSEN)

SSEN is the network operator for Alton and the villages around it. A solar system cannot simply be connected and left: SSEN has to be notified, or asked first, depending on its size.

Up to 3.68kW per phase is the G98 route, where the installer fits the system and sends SSEN the G98 form within 28 days of commissioning. Anything above that, up to 50kW, is a G99 application made before the installation, and SSEN says its quotation can take up to 45 working days from receiving the right information.

Cost, output and payback in Alton

PackageSystemPriceOutput a yearSaving a yearPayback
Solar panels8 panels (3.6kW)£7,6733,094 kWh£465About 17 years
Solar panels and a battery10 panels (4.6kW) with a 5.3kWh battery£9,2663,868 kWh£751About 12 years

Prices are our list prices with one side of scaffolding. Output is the estimate our calculator and Solar Report start from, 850 kWh a year for each kW of panels. It is one figure for the whole country and not a measurement for Alton: your roof's direction, pitch and shade move it, and a survey gives the figure for your roof. Savings are for a home using 2,900 kWh of electricity a year that uses 21% of what its panels generate, or 52% with a battery, and exports the rest at 12p a kWh, with electricity at 26.32p a kWh (the Ofgem price cap for 1 October to 31 December 2026). Payback is the price divided by the yearly saving.

Get my instant price!

Not ready for a quote?

Get our free Solar Buyer's Report and read it in your own time.

Get the free Solar Report

Areas we cover in and around Alton

  • Holybourne
  • Binsted
  • Chawton
  • Four Marks
  • Medstead

Postcode districts: GU34

Solar panels in Alton: your questions

Do I need planning permission for solar panels in Alton?

Most houses do not. Roof panels are normally permitted development when they stay below the top of the roof and project no more than 200mm from the slope. Listed buildings need consent, and homes in the town centre, The Butts, Anstey or Holybourne conservation areas have extra limits, so ask East Hampshire District Council if you are unsure.

Is Chawton in the South Downs National Park, and does that change anything?

Yes, Chawton is inside the National Park, and so is Binsted. Roof panels on a house can still be permitted development there, but panels on a flat roof need prior approval, and both villages also have a conservation area. The South Downs National Park Authority is the planning authority, with East Hampshire District Council handling applications for it.

Who is the electricity network operator in Alton?

Scottish and Southern Electricity Networks (SSEN). The installer notifies SSEN within 28 days of commissioning a system of up to 3.68kW per phase, under G98. A larger system needs a G99 application to SSEN before it is installed.

Does the page cover Four Marks and Medstead?

Yes. Both are in East Hampshire district, share Alton’s GU34 postcode district and are on the SSEN network. Neither is inside the National Park, so East Hampshire District Council is the planning authority for both.

Ready for solar in Alton?

Send us your details for a free quote, see a price now with the calculator, or call us.

Your free quote

Your information is secure and will never be shared.