Panel installers in Winchester — what to expect
1. On-site survey. Roof measurement, structural check, covering condition, shading assessment, consumer unit and earthing inspection, and confirmation of which planning authority covers the property. On period properties we also check whether the roof covering can take fixings before anything else is discussed.
2. System modelling. We combine the survey measurements with satellite and aerial imagery to build an accurate array layout and a shading profile across the year. The imagery gets us the geometry; the site visit gets us everything the imagery can't see — rafter condition, tile type, access, and the tree that's only a problem in December. Neither is sufficient alone, which is why we won't quote from imagery only.
3. Installation day. Scaffolding goes up first, usually the day before. The crew fits the mounting system, lays the panels, runs DC cabling to the inverter position, installs the inverter, isolators and any battery, and connects into the consumer unit. Most domestic installs are one to two days on site.
4. Commissioning and handover. Full electrical testing to BS 7671, generation verification, inverter configured to the correct DNO grid settings, MCS registration, and monitoring set up on your phone. You get the test certificates, the MCS certificate, DNO paperwork and a walkthrough before we leave.
Planning permission, listed buildings and grid connections
Which authority covers you? This is the first thing to establish and it catches people out. The South Downs National Park Authority is the planning authority for around 40% of the Winchester district — broadly the eastern and southern side, taking in the Meon Valley and the downland villages. Winchester City Council covers the other 60%. Two authorities, two sets of local policy, different weight on landscape and visual impact. We confirm which one applies at survey.
When you don't need planning permission. In most cases, roof-mounted solar on a house is permitted development — including within a conservation area — provided the panels project no more than 200mm beyond the roof plane, don't sit above the highest part of the roof, and aren't on a wall fronting a highway.
When you do.
- Wall-mounted panels on a wall fronting and visible from a highway need permission.
- Ground-mounted arrays visible from a highway, and most standalone installations on designated land, need permission.
- Article 4 directions. Winchester has Article 4 directions on some properties, which remove permitted development rights that would otherwise apply. If one covers your property, you need planning permission for work that your neighbour two streets away could do freely. This is checkable in advance and we check it.
- Listed buildings always need Listed Building Consent, regardless of where the panels go.
Listed Building Consent, briefly. It's a separate application from planning permission, submitted to the relevant authority, and it needs a heritage statement that engages properly with what makes the building significant. Consent is achievable — the approach that works is keeping panels off principal elevations, using rear or concealed slopes or a secondary building, and specifying all-black frames and rails rather than silver. Determination typically takes eight weeks or more. Pre-application advice is usually worth the fee on a sensitive property.
Grid connections — G98 and G99. Every system has to be notified to the DNO, which across Winchester is SSEN.
- G98 is a "connect and notify" route for small systems — up to 16A per phase, roughly 3.68 kW on a single-phase supply. Notification goes in after commissioning.
- G99 applies to anything larger, and to most solar-plus-battery combinations, because the battery's inverter output counts. This one is apply and wait — approval must be in place before the system energises, and it can take several weeks.
We handle the paperwork. Planning applications, Listed Building Consent submissions, heritage statements, G98 notifications and G99 applications. You don't chase any of it.