Solar Panels in Fleet

CRG Direct is an MCS certified solar panel installer based in Port Solent, about 32 miles from Fleet in a straight line. Solar panels start from £7,522, or £9,266 for 10 panels and a battery.

MCS CertifiedNICEIC Approved
in pounds

Get a free quote in Fleet

Your information is secure and will never be shared.

Solar in Fleet: the local details

Fleet is a town of detached houses more than most. The 2021 Census recorded more than four in ten homes across Hart district as detached, and around half in the Fleet East and Fleet West wards. Fleet Central is the exception, where nearly three in ten homes are flats.

The oldest residential part is North Fleet, built up mainly from the 1880s. Hart District Council’s appraisal describes detached family houses of two storeys in spacious plots, often hidden from the road by planting, with slated roofs on several of the Victorian houses. Large detached roofs give room for a bigger array, but the mature trees that mark out this part of town can shade a roof for part of the day, so shading is measured at survey before a layout is drawn.

Hart District Council

Hart District Council is the planning authority for Fleet, Church Crookham, Crookham Village, Elvetham Heath and Dogmersfield.

Roof panels on a house are normally permitted development, so most homes need no planning application. On a pitched roof the panels must not sit above the highest part of the roof (the chimney does not count) or project more than 200mm from the slope. Listed buildings are outside those rules and need listed building consent for work that alters them.

Hart has 32 conservation areas. Those around Fleet are North Fleet, Crookham Village, Dogmersfield and the Basingstoke Canal. In a conservation area panels cannot go on a wall that fronts a highway, and a flat roof installation needs the council’s prior approval. Hart also uses Article 4 Directions in some conservation areas, which can mean a planning application is needed for work that would not need one elsewhere; the council’s online maps show where they apply.

Scottish and Southern Electricity Networks (SSEN)

Fleet and the villages around it are on the SSEN network. SSEN has to be told about every solar system connected to it, and the installer normally does this for you.

A system of up to 3.68kW per phase follows the G98 route: it is installed first, and the G98 form goes to SSEN within 28 days of commissioning. Above that size, and up to 50kW, the installer applies under G99 before the installation. SSEN says its quotation for a G99 application can take up to 45 working days once it has the correct information.

Cost, output and payback in Fleet

PackageSystemPriceOutput a yearSaving a yearPayback
Solar panels8 panels (3.6kW)£7,6733,094 kWh£465About 17 years
Solar panels and a battery10 panels (4.6kW) with a 5.3kWh battery£9,2663,868 kWh£751About 12 years

Prices are our list prices with one side of scaffolding. Output is the estimate our calculator and Solar Report start from, 850 kWh a year for each kW of panels. It is one figure for the whole country and not a measurement for Fleet: your roof's direction, pitch and shade move it, and a survey gives the figure for your roof. Savings are for a home using 2,900 kWh of electricity a year that uses 21% of what its panels generate, or 52% with a battery, and exports the rest at 12p a kWh, with electricity at 26.32p a kWh (the Ofgem price cap for 1 October to 31 December 2026). Payback is the price divided by the yearly saving.

Get my instant price!

Not ready for a quote?

Get our free Solar Buyer's Report and read it in your own time.

Get the free Solar Report

Areas we cover in and around Fleet

  • Church Crookham
  • Crookham Village
  • Dogmersfield
  • Elvetham Heath

Postcode districts: GU51, GU52, RG27

Solar panels in Fleet: your questions

Do I need planning permission for solar panels in Fleet?

For most houses, no. Roof panels are normally permitted development if they stay below the top of the roof and project no more than 200mm from the slope. Listed buildings, and some homes in the North Fleet, Crookham Village and Dogmersfield conservation areas, are treated differently, so check with Hart District Council if your home is in one.

Will the trees in North Fleet stop solar panels working?

Not usually, but they can reduce what a roof generates. The council’s appraisal of North Fleet notes its abundance of trees and mature shrubbery, and trees in a conservation area are under tighter controls, so cutting one back to clear a roof is not something to assume. Shading is measured at the survey and the layout is designed around it.

Who is the network operator in Fleet, and do I have to apply to them?

The operator is Scottish and Southern Electricity Networks (SSEN). For a system of up to 3.68kW per phase the installer notifies SSEN within 28 days of commissioning, under G98. A larger system needs a G99 application to SSEN before it is fitted.

Is Dogmersfield covered from the same page as Fleet?

Yes. Dogmersfield is in Hart district and on the SSEN network, like Fleet, though its postcodes begin RG27. The village has its own conservation area, so the conservation area rules above may apply to your home.

Ready for solar in Fleet?

Send us your details for a free quote, see a price now with the calculator, or call us.

Your free quote

Your information is secure and will never be shared.