Solar Panels in Petersfield
CRG Direct is an MCS certified solar panel installer based in Port Solent, about 13 miles from Petersfield in a straight line. Solar panels start from £7,522, or £9,266 for 10 panels and a battery.
Get a free quote in Petersfield
Your information is secure and will never be shared.
Solar in Petersfield: the local details
Petersfield is a historic market town inside the South Downs National Park. The conservation area appraisal describes its 19th century residential streets as uniform terraces and groups of detached or semi-detached houses with brick frontages, usually under slate roofs, and it records steeply pitched clay tile roofs on older buildings in the centre. Slate and old clay tile both take panels, but they need the right fixings and more care than a modern concrete tile.
Away from the centre the housing is more mixed. In the 2021 Census, terraced houses were the largest group in the Petersfield Heath ward, semi-detached houses in Bell Hill and Causeway, and flats in St Peter’s.
Steep, Stroud, Sheet, Liss and Rogate are villages in the same protected landscape. A roof there is judged by the same national rules as one in the town, with the extra limits that apply in a National Park.
South Downs National Park Authority
Petersfield, Steep, Stroud, Sheet, Liss and Rogate are all inside the South Downs National Park, so the National Park Authority is the planning authority for every address on this page. Applications are processed on its behalf by the district council: East Hampshire District Council for Petersfield and the Hampshire villages, and Chichester District Council for Rogate, which is in West Sussex.
Being in a National Park does not by itself mean a planning application. Roof panels on a house are normally permitted development if they stay below the highest part of the roof, not counting the chimney, and project no more than 200mm from the slope. What does change is a flat roof: in a National Park the planning authority’s prior approval is needed before panels go on one. A listed building always needs listed building consent for work that alters it.
Petersfield’s conservation area was designated in 1976 and revised in 1982, 1991 and 2013. Sheet has had one since 1976, and Liss has two, Liss (1990) and West Liss (1977). In a conservation area panels cannot be fitted to a wall that fronts a highway.
Scottish and Southern Electricity Networks (SSEN)
The electricity network in Petersfield and the villages around it, including Rogate over the county boundary, belongs to SSEN.
SSEN’s process depends on the size of the system. Up to 3.68kW per phase, the installer fits it and sends SSEN the G98 form within 28 days of commissioning. Above that, and up to 50kW, the installer makes a G99 application before the installation, and SSEN says its quotation can take up to 45 working days once it has the right information.
Cost, output and payback in Petersfield
| Package | System | Price | Output a year | Saving a year | Payback |
|---|---|---|---|---|---|
| Solar panels | 8 panels (3.6kW) | £7,673 | 3,094 kWh | £465 | About 17 years |
| Solar panels and a battery | 10 panels (4.6kW) with a 5.3kWh battery | £9,266 | 3,868 kWh | £751 | About 12 years |
Prices are our list prices with one side of scaffolding. Output is the estimate our calculator and Solar Report start from, 850 kWh a year for each kW of panels. It is one figure for the whole country and not a measurement for Petersfield: your roof's direction, pitch and shade move it, and a survey gives the figure for your roof. Savings are for a home using 2,900 kWh of electricity a year that uses 21% of what its panels generate, or 52% with a battery, and exports the rest at 12p a kWh, with electricity at 26.32p a kWh (the Ofgem price cap for 1 October to 31 December 2026). Payback is the price divided by the yearly saving.
- What solar panels cost to install
- Solar panel output by month
- How long solar panels take to pay for themselves
Not ready for a quote?
Get our free Solar Buyer's Report and read it in your own time.
Areas we cover in and around Petersfield
- Steep
- Stroud
- Sheet
- Rogate
- Liss
Postcode districts: GU31, GU32, GU33
Solar panels in Petersfield: your questions
Petersfield is in the South Downs National Park. Can I still have solar panels?
Yes, in most cases. Roof panels on a house can still be permitted development inside the National Park, provided they stay below the top of the roof and project no more than 200mm from the slope. Panels on a flat roof need prior approval first, and a listed building needs listed building consent.
Who decides a planning application for solar panels in Petersfield?
The South Downs National Park Authority is the planning authority. In practice an application is handled by East Hampshire District Council’s planning team, which works on the Authority’s behalf. For Rogate the same arrangement runs through Chichester District Council.
What applies in the Petersfield conservation area?
The conservation area covers the historic centre and was last revised in 2013. Panels there cannot go on a wall that fronts a highway, and a flat roof installation needs prior approval. Roof panels on a house that meet the national limits can still be permitted development, but it is worth confirming with the planning team before ordering.
Who is the network operator in Petersfield?
Scottish and Southern Electricity Networks (SSEN). A system of up to 3.68kW per phase is notified to SSEN by the installer within 28 days of commissioning (G98). A larger one needs a G99 application before it is fitted.
Ready for solar in Petersfield?
Send us your details for a free quote, see a price now with the calculator, or call us.
Your free quote
Your information is secure and will never be shared.