Solar Panels in Havant

CRG Direct is an MCS certified solar panel installer based in Port Solent, about 5 miles from Havant in a straight line. Solar panels start from £7,522, or £9,266 for 10 panels and a battery.

MCS CertifiedNICEIC Approved
in pounds

Get a free quote in Havant

Your information is secure and will never be shared.

Solar in Havant: the local details

Much of the borough of Havant was built after the Second World War. The council’s borough profile records that Portsmouth City Council bought land north and west of Havant town to rehouse people after the bombing of Portsmouth, that farms and woodland began to be developed for housing in 1947, and that Leigh Park and Waterlooville grew up as a result. Havant itself spread to join Langstone, Warblington, Bedhampton and Denvilles.

The 2021 Census shows the result: about three in ten homes in the borough were semi-detached, slightly fewer were detached, under a quarter were terraced and about one in six were flats. The historic centres of Havant and Emsworth are both conservation areas.

For solar, the type of house matters less than the roof itself. The survey looks at which slopes face the sun, how much clear area each has and what shades it.

Havant Borough Council

Havant Borough Council is the planning authority for Havant, Waterlooville, Cowplain, Purbrook, Leigh Park, Bedhampton, Emsworth and Hayling Island. On most houses, roof panels are permitted development, with no planning application needed, provided they stand no more than 0.2 metres off the roof slope and no higher than the highest part of the roof.

The borough has fourteen conservation areas: Black Dog, Brockhampton, Coastguards, Emsworth, Langstone, Lymbourn Road, Mill Lane, Old Bedhampton, Sir George Staunton, St Faith’s, St John’s, St Peter’s, Wade Court and Warblington. The council publishes a map and a character appraisal for each. In a conservation area, panels on a wall facing a highway need planning permission and panels on a flat roof need the council’s prior approval.

The council has one Article 4 direction, in the Langstone Conservation Area, which removes some permitted development rights there. A listed building anywhere in the borough needs listed building consent.

Scottish and Southern Electricity Networks (SSEN)

SSEN is the network operator for the borough of Havant. A solar system of 3.68kW or less per phase goes through G98: it is installed, and your installer sends SSEN the G98 form within 28 days of commissioning.

A system above 3.68kW per phase, up to 50kW, goes through G99 and must be applied for before installation. SSEN says it can take up to 45 working days to send its quotation once it has the correct information.

SSEN then confirms by email that the commissioning documents are logged and the system complies. Most suppliers ask for that email before starting an export tariff.

Cost, output and payback in Havant

PackageSystemPriceOutput a yearSaving a yearPayback
Solar panels8 panels (3.6kW)£7,6733,094 kWh£465About 17 years
Solar panels and a battery10 panels (4.6kW) with a 5.3kWh battery£9,2663,868 kWh£751About 12 years

Prices are our list prices with one side of scaffolding. Output is the estimate our calculator and Solar Report start from, 850 kWh a year for each kW of panels. It is one figure for the whole country and not a measurement for Havant: your roof's direction, pitch and shade move it, and a survey gives the figure for your roof. Savings are for a home using 2,900 kWh of electricity a year that uses 21% of what its panels generate, or 52% with a battery, and exports the rest at 12p a kWh, with electricity at 26.32p a kWh (the Ofgem price cap for 1 October to 31 December 2026). Payback is the price divided by the yearly saving.

Get my instant price!

Not ready for a quote?

Get our free Solar Buyer's Report and read it in your own time.

Get the free Solar Report

Areas we cover in and around Havant

  • Waterlooville
  • Cowplain
  • Purbrook
  • Widley
  • Crookhorn
  • Leigh Park
  • West Leigh
  • Bedhampton
  • Denvilles
  • Langstone
  • Warblington
  • Emsworth
  • Hayling Island

Postcode districts: PO7, PO8, PO9, PO10, PO11

Solar panels in Havant: your questions

Are Waterlooville and Cowplain covered from the Havant page?

Yes. Waterlooville, Cowplain and Purbrook are in the borough of Havant, in postcode districts PO7 and PO8, so Havant Borough Council is their planning authority. Most houses there can have roof panels as permitted development within the national limits.

Can I have solar panels on a house in Emsworth’s conservation area?

Often, yes. Emsworth’s old town is one of Havant Borough Council’s fourteen conservation areas, and the council publishes a map of its boundary. Inside it, panels on a wall facing a highway need planning permission and panels on a flat roof need prior approval, while a pitched roof slope is not restricted by the national rules. A listed building needs listed building consent as well.

Does Havant have any Article 4 directions that affect solar?

Havant Borough Council has one Article 4 direction, and it applies in the Langstone Conservation Area. The direction is published on the council’s conservation areas page. If your home is in Langstone, read it or ask the council’s planning service what it means for your roof before going further.

Who is the network operator for Havant, Waterlooville and Emsworth?

SSEN (Scottish and Southern Electricity Networks) for all three. A system of 3.68kW or less per phase is notified under G98 within 28 days of commissioning, and a larger system needs a G99 application before it is installed.

Ready for solar in Havant?

Send us your details for a free quote, see a price now with the calculator, or call us.

Your free quote

Your information is secure and will never be shared.